frp双层采光板的安装方法 |
添加时间:2017/12/9 14:24:26 浏览次数: |
安装方法主要有两种, 1、嵌入安装法 A、嵌入支撑框架部分之保护膜会影响填缝料与PC板之粘结,故在PC板嵌入之前,应先切掉嵌入量5-10mm宽之保护膜。 B、板材热胀冷缩量与金属框架不同,且具绕曲性和承受风压,因此须有时当嵌入量,胀缩预留空间及选择适当板厚。 2、螺丝安装法 A、室外装置或温差在±8摄氏度以上时,任何螺栓、铆钉穿孔,必须加大孔径,容许温度胀缩之预流量。一般孔径皆须大于螺栓直径50%。铆钉选铝材,应避免使用自攻螺丝。 B、所有孔穴皆应以矽胶充满空隙,并以矽胶涂覆外露部分,以防止清洁剂渗入边缘,防止延发性龟裂。 C、铆钉钉头部应比柄部大1.5-2.0倍,并以垫片充垫其间,不使铆头直接压迫板面,减少压力。 D、上螺丝不可过紧否则引发应力。 E、长边、短边请加金属压条,并预留膨胀空隙,加强固定力量。
There are mainly two installation methods. 1, the protective coating with embedded installation method A and embedded support frame will affect the bonding between the filler and the PC plate. Therefore, before the PC plate is embedded, the protective film with 5 10mm wide width should be cut off. B, sheet metal frame with different heat expansion and cold shrinking, and winding and under the pressure, so must sometimes when the embedding capacity, expansion and contraction of reserved space and appropriate thickness. 2, when screw installation method A, outdoor device or temperature difference is over 8 degrees Celsius, if any bolt or rivet is perforated, we must enlarge the aperture and allow the temperature to expand and shrink. The general aperture must be greater than 50% of the diameter of the bolt. The use of self tapping screws should be avoided by the rivet selection of aluminum. B, all the holes should be in full space with silicone, silicone coated exposed parts to prevent the cleaning agent into the edge, to prevent cracking of yanfa. The head of C and rivet nail should be 1.5 - 2 times larger than that of the handle, and it is filled with gasket, and the rivet head is not directly oppressed on the plate surface and the pressure is reduced. D, the screw can not be too tight or cause stress. E, long side, short side, please add metal bar, and reserve expansion gap, strengthen the fixed strength. |
上一页 采光板的固定方法 |
下一页 FRP采光板在现代农业中应用 |
Copyright © 技术支持:遨游网络